Above Ground Pool Removal

Above Ground Pool Removal in Mandurah — Frame, Liner and All

A rusted-out above ground pool doesn't owe you anything. Most come down, get loaded and are gone inside a day — fence rules observed the whole way.

When the wall rusts, the pool is finished

Above ground pools in the Peel live a hard life. Salt air off the estuary and the coast gets into the steel wall and every fastener, liners go brittle in the sun, and the timber decks built around them rot at the stump line. Once the wall is rusting through, no liner replacement is worth the money — the pool is done, and every year it stands it's still a fenced body of water the council expects a compliant barrier around, inspected on the four-yearly cycle.

Taking it down properly is the cheap end of pool removal — typical figures are on the What It Costs page — and unlike an inground removal, there's usually no excavation at all.

The job runs in a fixed order

  • Drain first, lawfully. Pool water is pumped down at a rate the ground can take — not sheeted across the neighbour's boundary. Saltwater pools take more care about where the water goes.
  • Barrier stays up. WA's Building Regulations 2012 require the safety barrier until the pool can no longer hold 300 mm of water. It comes down late in the day, not first.
  • Liner out, wall down, frame flat. The liner is cut and rolled, the steel wall is unbolted or cut into panels, the frame is dropped and stacked.
  • Load and go. Steel to the metal recycler, liner and rot to the tip — cartage and tip fees inside the quote.
  • Pad levelled. The sand pad gets spread and raked so you're left with a level piece of yard, not a crop circle.

Most standard round and oval pools — the 4.5 m to 7.3 m sizes common in Greenfields-era and Golden Bay backyards — are on the truck by mid-afternoon.

What's included, what's not, what it depends on

Included:

  • Draining, dismantling, loading, cartage and all tip fees
  • Attached ladders, pumps and hoses (pump electrically disconnected first — see below)
  • Sand pad spread and levelled

Not included:

  • Electrical disconnection of the pump and any lighting — your electrician, before we start
  • New turf or landscaping over the pad

What it depends on:

  • Decking. A wrap-around timber deck can double the volume of waste; it's quoted in the same visit so nothing half-finished gets left.
  • Access. Panels carry through a standard gate; a fully fenced rear yard with no side access just means more carrying, not a different job.
  • Semi-inground pools. Sunk partway into the sand, common on sloping Wannanup and Madora Bay blocks — these sit halfway to an inground job and get quoted after a look.

Straight answers

  • Permit? Usually not for a small above ground pool — but confirm your case, and the council must still be notified after removal so the pool leaves the four-yearly inspection register and the fee leaves your rates. Details on Approvals.
  • Is the steel worth anything? As scrap, a little — it's factored into the quote rather than pocketed quietly.
  • Old spa underneath the deck too? Common combo — see spas and plunge pools; both go in one visit.

We ask the contractors we work with to hold the relevant WorkSafe WA licences and public liability cover — ask to see them. Call (08) 9516 1339 with the pool's size and what surrounds it, and you'll get a number and a day.

More services

Explore our other services

Inground Pools

Full removal or backfill of old concrete and fibreglass inground pools, leaving the yard solid and ready for whatever comes next.

Learn more →

Spas and Plunge Pools

Removal of old spas and small plunge pools that have stopped earning their keep, with the site left tidy and level.

Learn more →

Pool Surrounds, Fencing & Paving

Pulling out cracked pool paving, coping and old safety fencing alongside the pool itself, so nothing half-finished gets left behind.

Learn more →

Kitchen & Bathroom Strip Outs

Stripping old kitchens and bathrooms back to the frame ahead of a renovation, including fixtures, tiling and cabinetry.

Learn more →
FAQs

Frequently asked questions

Does removing an above ground pool need a council permit?

Often it sits under the threshold — the City of Mandurah's guidance is that a demolition permit is generally required for buildings but not for shed- or patio-scale structures up to 40 m², and most above ground pools are in that territory. It's worth a phone call to confirm for your specific setup, especially if there's a large attached deck. What is always required: keeping the safety barrier compliant until the pool can't hold 300 mm of water, and telling the council in writing once it's gone so it comes off the inspection register.

Can't I just pull the pool down myself?

Physically, many people could — the catch is the water, the waste and the rules. 30,000-odd litres has to go somewhere that isn't your neighbour's yard, several hundred kilos of steel, liner and salt-corroded fasteners have to be carted and tipped, and the barrier obligations apply until the pool can no longer hold water. By the time you've hired a trailer and paid tip fees, the gap to a quoted, done-in-a-day job is smaller than most people expect — see the What It Costs page.

What's left where the pool stood?

A compacted sand pad and a dead circle of lawn. The quote includes spreading and levelling the pad so the yard is usable straight away; grass takes a season to grow back over it. If there was a timber deck around the pool, its removal — stumps included — is quoted as part of the same visit.

Free, no-obligation

Get your free quote today

Fast Call Back Service!

Call (08) 9516 1339