Inground Pools
Full removal or backfill of old concrete and fibreglass inground pools, leaving the yard solid and ready for whatever comes next.
Learn more →A removed pool with the old fence and cracked paving still standing isn't a finished job. The surrounds are half the mess — they're quoted in from the start.
Stand at the back fence of a 1990s canal-estate block in Mandurah and look at what surrounds the pool: 40-odd square metres of paving, concrete coping bedded on mortar, a raised limestone-block planter or two, and a safety fence that's been eating salt air since it went up. When the pool goes, all of that either goes with it or stands around a patch of new sand looking exactly like what it is — leftovers.
That's why surrounds are quoted as part of the inground or above ground removal from the start, not discovered as a variation on day two. What the combined job typically costs is on the What It Costs page.
Included:
Not included:
What it depends on:
Under the Building Regulations 2012 (WA), a compliant barrier is required around anything holding more than 300 mm of water, right up until the pool can't. On a full removal the sequence is fixed: shell out or breached, hole backfilled and compacted, then the barrier comes down and the council is notified in writing so the property leaves the four-yearly barrier inspection register and the fee leaves the rates. Permits and notification steps are laid out on the Approvals page.
We ask the contractors we work with to hold the relevant WorkSafe WA licences and public liability cover — ask to see them.
Call (08) 9516 1339 and describe what's around the pool, not just the pool — the quote will match what's actually in the yard.
Full removal or backfill of old concrete and fibreglass inground pools, leaving the yard solid and ready for whatever comes next.
Learn more →Take-down and haul-away of tired above ground pools and their frames, clearing the space back to usable yard.
Learn more →Removal of old spas and small plunge pools that have stopped earning their keep, with the site left tidy and level.
Learn more →Stripping old kitchens and bathrooms back to the frame ahead of a renovation, including fixtures, tiling and cabinetry.
Learn more →Only once the pool can no longer hold more than 300 mm of water. WA's Building Regulations 2012 keep the barrier requirement in force until that point — so on a removal job the fence is dismantled near the end, after the shell is out or breached and the hole is filled, never as the first task. Any contractor who wants to drop the fence on day one to get machine access has the sequence wrong.
Frameless glass panels in good condition have genuine second-hand value and can be set aside unbroken — say so at quote stage, because careful dismantling takes longer than demolition. Powder-coated aluminium in the salt-affected suburbs is usually corroded at every weld and spigot by the time the pool goes, and it's worth only its scrap weight. Either way, what's kept and what's carted is agreed before the job starts.
If the pool is staying in use — no, not the fence: it must stay compliant, and swapping it is a job for a fencing installer, not a removal crew. But replacing cracked coping and paving around a working pool is a legitimate small strip-out job, provided temporary barrier compliance is maintained while the work happens. Ask when you call and you'll get a straight yes or no for your setup.